PROJECTS

An overview of ongoing projects.

Irland - Fast Frequency Reserve

Installation of a hybrid storage system for the provision of Fast Frequency Response according to Irish DS3 regulations.


Properties: Container with 2 untis 250 - 7
Rated power: 500 kW
Dynamics: 150 ms


Customer: EirGrid

UK – Enhanced Frequency Response

Installation of a hybrid energy storage system with 3 MW total power and multifunctional use. The main goals are the provision of Enhanced Frequency Response and cycle protection of the battery.


Properties: Container with 4 units 250 - 7
Rated power: 1 MW
Dynamics: 0.5 s

 

Customer: NationalGrid

Germany – Steam turbine flexibility

Our flywheel flexibilizes a 14 MW steam turbine to provide Frequency Containment Reserve.

 

Properties: Container with 2 units 500 - 12

Rated power: 1 MW

Dynamics: Reduced to 30 seconds (according to regulations)

 

Customer: NDA signed

Germany – Combined heat and power unit flexibility

Our flywheel increases the flexibility of a 350 kW combined heat and power plant for providing Frequency Containment Reserve.

 

Properties: Container with 1 unit 100 - 7

Rated power: 100 kW

Dynamics: Reduced to 30 seconds (according to regulations)

Customer: NDA signed

Germany – Back up power and Power2Heat flexibility

The flywheel is coupled with a 250 kW backup diesel generator and a 250 kW Power2Heat system for providing Frequency Containment Reserve.

 

Properties: Container with 1 unit 250 - 7 Flywheel

Rated power: 250 kW

Dynamics: reduced to 30 s (according to regulations)


Customer: NDA signed